Final Checklist
- Submittals showing compliance with all applicable provisions of the Perry Municipal Code and Public Works Standards.
- Final Plat
- Engineer’s estimate of costs
- Grading and storm water plans with calculations
- Plan, profiles, and section drawings for roadways
- Final utility plans
- Detail drawings
- Written approval from other applicable agencies (e.g. Pineview Water, UDOT, Army Corps, etc.)
- Geotechnical report, traffic study, identification of natural hazards
- CCR’s as applicable
- Architectural and landscape plans as applicable
- All information submitted with the Preliminary Subdivision Application