Final Checklist

  • Submittals showing compliance with all applicable provisions of the Perry Municipal Code and Public Works Standards.
  • Final Plat
  • Engineer’s estimate of costs
  • Grading and storm water plans with calculations
  • Plan, profiles, and section drawings for roadways
  • Final utility plans
  • Detail drawings
  • Written approval from other applicable agencies (e.g. Pineview Water, UDOT, Army Corps, etc.)
  • Geotechnical report, traffic study, identification of natural hazards
  • CCR’s as applicable
  • Architectural and landscape plans as applicable
  • All information submitted with the Preliminary Subdivision Application